INSPECTION

Bonding is the inspection that matters.

A balance-of-system installation is a set of parts that must be electrically continuous as well as mechanically sound, and continuity is what cannot be seen.

Illustrative inspection checklist

Continuity
Measured between tray sections, not assumed through the fixings
Fixing grade
The correct grade for the atmosphere, confirmed on the part
Dissimilar separation
Washers present where the drawing calls for them
Stand-off
Measured on the installed bracket, because it is the cooling path
Vent filters
Present, correctly seated and recorded as a consumable
Coating
Intact after installation, with touch-up where it was cut
Torque
On structural fixings, recorded per connection type
Marking
Batch identifier legible on the part or its packaging

An illustrative checklist for a fictional range. A real programme defines the tolerance, the sampling method, the inspection window and the remedy if a batch fails.

The four things a programme needs in writing.

The tolerance, the sampling method, the window in which inspection happens, and what happens if the batch fails. Without all four, a failed delivery becomes an argument rather than a process.

Why continuity is measured rather than assumed.

Because a coated part does not conduct through its coating. A tray run bolted through powder coat looks bonded and is not, and the fault appears at the first insulation test rather than at installation.