GUIDE

The order the questions are worth asking in.

This is the sequence a balance-of-system project follows when it goes well, and the point at which each step becomes expensive to revisit.

1 · The site
Location, height, exposure and atmosphere
2 · The ambient
The summer peak, because the thermal case is built from it
3 · The heat path
Where it goes, and who maintains whatever removes it
4 · The cable
Type, fill and separation, because these decide the tray
5 · The load case
Cable, wind and thermal, not the weight of the parts
6 · The parts
Chosen for the two cases above rather than by dimension
7 · The calculation
Against the code, signed by someone qualified
8 · The as-built
Because the installation and the drawing differ
Why the order matters.

Each step constrains the next. Choosing an enclosure before the ambient is choosing a vent area for a temperature nobody has established, and choosing a tray before the cable fill is sizing a part for its appearance.

Where projects usually go wrong.

Step two, assumed, and step eight, not recorded. Both are cheap to do properly and expensive to discover after a system is on a roof.