DEMO — fictional range. Local brief only, NOT SENT. No personal data is collected or transmitted.
INSPECTION
Two fittings of one order have to match.
A lighting scheme is judged on its worst pair. Inspection is therefore about consistency between units, not about any single one.
Illustrative inspection checklist
- Colour consistency
- Units from the order compared with each other, not with a reference alone
- Output
- Measured at the fitting, at the beam declared
- Beam angle
- Measured, because a wider beam is a different scheme
- Flicker
- Assessed at low dim, where most drivers are weakest
- Dimming range
- The lowest level before the light becomes unstable
- Surface finish
- Even, and free of polishing marks on visible surfaces
- Earthing
- Continuity on metal-bodied fittings, measured
- Marking
- Batch identifier legible on the fitting or its packaging
An illustrative checklist for a fictional range. A real programme defines the tolerance, the sampling method, the inspection window and the remedy if a batch fails.
The four things a programme needs in writing.
The tolerance, the sampling method, the window in which inspection happens, and what happens if the batch fails. Without all four, a failed delivery becomes an argument rather than a process.
Why flicker is on the list.
Because it is invisible on a specification sheet and obvious in a room. It appears at low dim, which is exactly where a scheme spends its evenings, and it is a driver property rather than an emitter one.