LUMENFOLDLighting / demo

DEMO — fictional range. Local brief only, NOT SENT. No personal data is collected or transmitted.

DOCUMENTS

What travels with a batch of fittings.

A lighting order arrives with paperwork or it arrives as a pallet of cartons. These are the documents worth asking for, and what each one establishes.

Photometric file
The beam and the distribution, measured rather than drawn
Colour consistency record
How closely the units in the order match each other
Output record
Delivered lumens at the fitting, at the beam declared
Driver specification
Dimming protocol, range and the flicker behaviour at low level
Ingress certificate
The rating, and whether it was tested as installed
Electrical certificate
Earthing and insulation on metal-bodied fittings
Revision statement
Which revision the batch was made to, and what it supersedes
Spares statement
Whether a later order will match this one

An illustrative list for a fictional range. A real programme agrees which documents are required, in what form, and how long they are retained.

The one that is most often missing.

The colour consistency record. A scheme with twenty fittings is judged on the worst pair, and a record that states only the nominal temperature describes the average rather than the range.

Why the photometric file has to be measured.

Because a beam angle on a drawing is a description and a photometric file is a result. A layout built from the description is a layout that may not survive the installation.