01
Access
The route from the loading bay to the room decides the packaging, the component sizes and how many people the job needs.
An access constraint discovered after manufacture is the most expensive kind of late information.
INSTALLATION
A frame that suits a showroom can fail in a corridor. Access, floor, substrate and who does the work are decided before the first piece is made, and all four are cheap to change then.
01
The route from the loading bay to the room decides the packaging, the component sizes and how many people the job needs.
An access constraint discovered after manufacture is the most expensive kind of late information.
02
Levelling and fixing decide whether a level piece ends up level, and they are the part of installation nobody photographs.
An uneven floor puts the load into the joints instead of the frame.
03
Installer skill decides whether the piece arrives assembled or in components, and that decision changes the pack.
A piece that needs a skilled installer is not a piece that gets one.
04
Contract furniture increasingly carries power, data and charging, and where those enter the piece is a design decision.
A cable run across the floor is the thing a client notices most.
Every value here is an original fictional example. Confirm site conditions before relying on any of it.
Finish is chosen by eye and often changed late. Access, floor and installer skill change the component sizes, the packaging and the assembly method, all of which are expensive to revise once tooling has run. Asking the site questions first costs a phone call; asking them last costs a retool.
Access. The piece is finished, the room is ready, and the corridor turns out to be too narrow for the component that was built in one piece. It is the most boring question on the list and the one most often skipped.