What a photograph cannot confirm.
A photograph shows the piece in good light, unloaded, on a floor. Everything that decides whether it survives five years happens later, under load, outdoors.
Example inspection checklist — illustrative
- Frame fixity
- Joints and fixings checked under the declared load
- Surface finish
- Confirmed on the delivered finish, not the sample piece
- Fastener corrosion
- Suitability confirmed for the declared environment
- Level and stability
- Checked assembled, on an uneven floor
- Component fit
- Moving parts checked for clearance and alignment
- Label and marking
- Care and batch marking legible on the piece
- Assembly instructions
- Present, legible and complete
- Packaging
- Correct protection for each component, correct carton marking
This checklist is an original fictional example. A real programme defines tolerances, the sampling method and who signs each result.
The agreement behind the signature.
Before anyone signs, a programme needs four things written down: the tolerance, the sampling method, the window in which the inspection happens, and the remedy if the batch fails. Without those four, a failed delivery becomes an argument rather than a process.
Continue.
Worth deciding early.
The level and stability check is on the list because a piece that rocks is a complaint on day one and a replacement on day thirty, and it is the cheapest line in the checklist to get right.