DOCUMENTS
What travels with a mounting package.
A mounting system arrives with paperwork or it arrives as a pallet of aluminium. These are the documents worth asking for, and what each one establishes.
- Material certificate
- Alloy and temper, traceable to the extrusion batch
- Anodising certificate
- Thickness in microns, because that is the corrosion life
- Structural calculation
- The load case, the code, and who signed it
- Layout drawing
- Module positions, rail runs and fixing centres by zone
- Torque specification
- Per connection type, for the installer to work to
- Torque record
- Completed at installation, because it cannot be checked later
- Earthing record
- Continuity measurements between rails and modules
- Warranty statement
- What is covered, for how long, and what voids it
An illustrative list for a fictional range. A real programme agrees which documents are required, in what form, and how long they are retained.
The one that is most often missing.
The torque record. It is the only evidence that the connections were made to the specification, it cannot be reconstructed afterwards, and it is the first thing asked for when an array fails.
Why the calculation has to name a signatory.
Because a calculation is only as good as the assumptions in it, and the assumptions are about a specific roof. A document that does not say who checked it against that roof is a template rather than a calculation.