HELIOSPANSolar mounting / demo

DEMO — fictional range. Local brief only, NOT SENT. No personal data is collected or transmitted.

ARRAY

The roof decides the layout before the module does.

An array is laid out on a roof, and the roof has zones, obstructions and a structure. Starting from the module count produces a layout that has to be redrawn.

The four questions worth asking.

They are asked before the layout, because each one changes the array rather than the components.

Which roof zone
Edge and corner zones see higher wind, so they carry closer fixing centres
What is in the way
Vents, rooflights and plant decide the usable rectangle before the module does
How the roof is built
The structure decides where fixings can go, and therefore the rail direction
Who maintains it
Access and walkways are a layout decision, not an afterthought

Where each decision comes from

Illustrative comparison — fictional example values
ConditionWhat it decidesWhat it costs to get wrong
Exposed edge zoneFixing centres and clamp countModules lifting in the first gale
Heavy snow regionRail span and module tiltA rail that deflects and cracks glass
Membrane roofWhether a penetration is allowed at allA warranty voided by the fixings
Tall buildingWind pressure adjusted for heightA design that was adequate at ground level
The expensive mistake.

Designing from the module count. The array is drawn to fit the modules and then has to be forced onto a roof that has zones and obstructions, and the rework is in the fixings rather than in the drawing.

And the one that looks harmless.

Ignoring the edge zone. The middle of a roof and its corners do not see the same wind, and the corners are where arrays lift.