Sampling is a decision, not a formality.

For a run of hundreds, inspecting everything is usually the wrong answer and inspecting nothing is never the right one. The sampling plan is what makes the difference.

Illustrative inspection checklist

Material certification
Traceable to the specific heat supplied
Thread gauging
Go and no-go on the declared class
Counterbore depth
The dimension that drifts first on a threaded spacer
Keyway width
Checked with the correct gauge, not by eye
Squareness
On formed parts, after forming rather than before
Coating thickness
And whether it is measured before or after plating
First and last piece
Measured, because they bracket the run
Marking
Batch identifier legible on the part or its bag

An illustrative checklist for a fictional range. A real programme defines the tolerance, the sampling method, the inspection window and the remedy if a batch fails.

The four things a programme needs in writing.

The tolerance, the sampling method, the window in which inspection happens, and what happens if the batch fails. Without all four, a failed delivery becomes an argument rather than a process.

Why the gauge is named.

Because a go/no-go gauge and a measured pitch diameter are different claims. Both can be correct and they do not mean the same thing, which matters when two reports disagree.