PLANAXISPrecision machining / demo

DEMO — fictional range. Local brief only, NOT SENT. No personal data is collected or transmitted.

REVISION

A drawing without a revision is a drawing without a history.

Most disputes in a machining programme are about which revision was made. A revision log is what makes a delivered part defensible years later.

Revision letter
Every change, however small, gets one
What changed
The feature, the value and the reason
Who asked
The change came from somewhere, and that is worth recording
When it took effect
Which batch was the first made to the new revision
What it supersedes
Which revision the new one replaces
Where it is held
The controlled copy, and who can issue the next one
Illustrative revision log — fictional example
RevChangeReasonFirst batch
ADatum moved from the outer face to the boreThe assembly is built from the boreExample · batch 2
BKeyway widened 6 to 8 mmThe mating key changedExample · batch 4
CHeat treatment moved before finishingMovement after hardeningExample · batch 5
Why a datum change is a revision like any other.

Because it changes what every other dimension means while leaving all the numbers on the drawing identical. It is the change most likely to go unrecorded and the one that causes the most confusion later.

The habit worth copying.

Recording which batch was the first made to the new revision. Without it, a batch sits between two revisions and nobody can say which drawing it was made to.