FOLD & FIELD / Home
QUALITY
What a render cannot confirm.
A render settles the picture. Everything a buyer is actually paying for is physical, and none of it is visible in one.
Example inspection checklist — illustrative
- Board or substrate
- Confirmed against the specified grade, not the sample colour
- Structural performance
- Load and compression measured on the delivered pack
- Print registration
- Checked against the approved artwork at the stated tolerance
- Colour
- Within the agreed tolerance under the agreed light source
- Adhesion
- Bond strength at the seams and closures
- Barcode and marking
- Scannable, correctly placed and correct in content
- Filling and closure
- The correct pack for the actual product, closed as specified
- Carton and pallets
- Correct marking, correct stacking, correct count
This checklist is an original fictional example. A real programme defines tolerances, the sampling method and who signs each result.
The agreement behind the signature.
Before anyone signs, a programme needs four things written down: the tolerance, the sampling method, the window in which the inspection happens, and the remedy if the batch fails. Without those four, a failed delivery becomes an argument rather than a process.
Continue.
Worth deciding early.
Registration checks and colour checks fail for opposite reasons and are caught by different people, which is why they are worth separating on the sheet: one of them gets skipped whenever the other is signed.