01
Water supply
Pressure, temperature and flow at the point of use
Washing performance is set by water at the machine, not by the machine on its own
INSTALLATION / COMMERCIAL-KITCHEN-3
A pass-through washer, a hood and a pre-rinse unit all put water into a room at a rate the room was not designed for. Supply, drainage and the floor between them decide whether the installation works.
01
Pressure, temperature and flow at the point of use
Washing performance is set by water at the machine, not by the machine on its own
02
Drain size, fall and route confirmed before the unit is positioned
A machine installed before its drainage is proved is a machine installed twice
03
Ventilation matched to the steam and heat actually produced
Warewashing heat is easy to underestimate and unpleasant to discover
04
A recorded cycle at the agreed temperature and chemistry
An uncommissioned wash cycle is an unproven one
| Supply measured | Pressure, temperature and flow checked at the machine, not at the inlet valve |
|---|---|
| Drainage proved | Size, fall and route confirmed before the unit is positioned |
| Ventilation confirmed | Extraction sized to the connected load with the hood running |
| Rack and clearance | Rack type and clearance checked against the actual ware in use |
| First cycle logged | Recorded at the agreed temperature and chemistry |
| Hand-over | Chemistry, service access and the responsible contact documented |
This checklist is an original fictional example. A real programme defines tolerances, the responsible party and the record that closes the job.
Nothing on this page describes a real supplier, a real installation or a measured condition. What it can do is put the questions in the order they need answering, which matters more than it sounds: supply and drainage are cheap to check before the equipment arrives and expensive to discover afterwards, and the order below is arranged so that the expensive surprises come first. The route, the supply and the drainage are settled before anything is positioned, because those three decide whether the unit can be installed at all.