01
Air movement
Space around and above each unit for the air it has to shed
Blocked airflow is the most common reason a correctly specified cabinet underperforms
INSTALLATION / COMMERCIAL-KITCHEN-2
A cold counter, a process cabinet and an upright all stand in the same room and all depend on the same thing: whether the air can move away from them. That is why refrigeration installations are planned around the room first.
01
Space around and above each unit for the air it has to shed
Blocked airflow is the most common reason a correctly specified cabinet underperforms
02
Condenser location and the temperature it can reject into
A unit that cannot reject heat cannot hold its temperature, however good the cabinet is
03
Dedicated circuits and a socket position for the actual running current
Shared circuits trip when the kitchen is busy, not when it is empty
04
A recorded temperature check under load
An empty cabinet at 4°C proves very little about a full one on service
| Clearance measured | Free air paths confirmed at the sides, back and top of every unit |
|---|---|
| Condenser sited | Away from heat sources and with the stated clearance actually available |
| Circuit confirmed | Rating and load checked at the socket, with the circuit identified |
| Levelling and doors | Units levelled and door seals checked for an even closure |
| Temperature logged | Recorded at the agreed points with the unit loaded and the kitchen running |
| Defrost route | Drain and access confirmed for the units that need them |
This checklist is an original fictional example. A real programme defines tolerances, the responsible party and the record that closes the job.
Nothing on this page describes a real supplier, a real installation or a measured condition. What it can do is put the questions in the order they need answering, which matters more than it sounds: supply and drainage are cheap to check before the equipment arrives and expensive to discover afterwards, and the order below is arranged so that the expensive surprises come first. The route, the supply and the drainage are settled before anything is positioned, because those three decide whether the unit can be installed at all.