01
Supply
Gas pressure, electrical phase and load for the chosen line
A unit that arrives and cannot be connected is a return, and it is an expensive one
INSTALLATION / COMMERCIAL-KITCHEN-1
A combi oven, a griddle and an induction range all fit through a standard door and all need something specific in the room. What that is decides whether the delivery is a delivery or an installation.
01
Gas pressure, electrical phase and load for the chosen line
A unit that arrives and cannot be connected is a return, and it is an expensive one
02
Extraction capacity matched to the equipment actually chosen
Extraction sized for the catalogue rather than for the installed load fails at the busiest hour
03
Route, door width and floor loading for the installed weight
The narrowest point on the route decides the delivery, and it is rarely the door
04
A recorded first run at the agreed settings
An uncommissioned unit is unproven, whatever the paperwork says
| Supply confirmed | Pressure, phase and load checked at the terminal, not assumed from the nominal rating |
|---|---|
| Ventilation balanced | Measured against the installed load with the hood running |
| Water and drainage | Pressure, temperature and fall confirmed where the line needs them |
| Clearances | Manufacturer clearances to wall, ceiling and neighbouring equipment observed |
| First run | Performed and recorded at the agreed settings before hand-over |
| Hand-over | Settings, service access and the responsible contact documented |
This checklist is an original fictional example. A real programme defines tolerances, the responsible party and the record that closes the job.
Nothing on this page describes a real supplier, a real installation or a measured condition. What it can do is put the questions in the order they need answering, which matters more than it sounds: supply and drainage are cheap to check before the equipment arrives and expensive to discover afterwards, and the order below is arranged so that the expensive surprises come first. The route, the supply and the drainage are settled before anything is positioned, because those three decide whether the unit can be installed at all.