QUALITY
What a catalogue photograph cannot confirm.
A module photograph shows a rectangle. What determines whether it earns its place on a roof is measured, and most of it is measured after installation.
Example inspection checklist — illustrative
- Module flash test
- Traceable to the specific production batch
- Frame and glass
- Load rating, impact resistance and coating integrity
- Mounting system
- Wind and snow load against the declared design load
- Electrical safety
- Insulation, earthing and protection coordination as installed
- String design
- Voltage, current and shade behaviour confirmed on site
- Storage commissioning
- Usable capacity measured, not quoted from the nameplate
- Protection settings
- Configured and recorded at commissioning
- Labelling and marking
- Ratings and warnings legible on the installed equipment
This checklist is an original fictional example. A real programme defines tolerances, the sampling method and who signs each result.
The agreement behind the signature.
Before anyone signs, a programme needs four things written down: the tolerance, the sampling method, the window in which the inspection happens, and the remedy if the batch fails. Without those four, a failed delivery becomes an argument rather than a process.
Continue.
Worth deciding early.
Protection settings are on the list because they coordinate the whole installation. Unconfigured protection is a system that works until the first fault, and then it does not.