QUALITY

What a catalogue photograph cannot confirm.

A module photograph shows a rectangle. What determines whether it earns its place on a roof is measured, and most of it is measured after installation.

Example inspection checklist — illustrative

Module flash test
Traceable to the specific production batch
Frame and glass
Load rating, impact resistance and coating integrity
Mounting system
Wind and snow load against the declared design load
Electrical safety
Insulation, earthing and protection coordination as installed
String design
Voltage, current and shade behaviour confirmed on site
Storage commissioning
Usable capacity measured, not quoted from the nameplate
Protection settings
Configured and recorded at commissioning
Labelling and marking
Ratings and warnings legible on the installed equipment

This checklist is an original fictional example. A real programme defines tolerances, the sampling method and who signs each result.

The agreement behind the signature.

Before anyone signs, a programme needs four things written down: the tolerance, the sampling method, the window in which the inspection happens, and the remedy if the batch fails. Without those four, a failed delivery becomes an argument rather than a process.

Continue.

Worth deciding early.

Protection settings are on the list because they coordinate the whole installation. Unconfigured protection is a system that works until the first fault, and then it does not.