NOCTRA / Home
QUALITY
What a photograph of a lit fitting cannot confirm.
A product photograph is taken switched on in a dark room with the exposure set for the fitting. A real project has daylight, reflected surfaces and people in it.
Example inspection checklist — illustrative
- Output and distribution
- Measured on the actual optical unit, not the marketing figure
- Colour rendering
- Confirmed at the stated CRI and correlated colour temperature
- Dimming behaviour
- At the low end as well as full output, on the declared driver
- Flicker
- Measured at the declared dim level with the declared driver
- Thermal behaviour
- Case temperature at the declared ambient and mounting
- Ingress protection
- Tested on the assembled fitting in its declared orientation
- Mounting and fixings
- Hold the declared weight with the declared fixings
- Packaging
- Correct accessories, correct protection, correct carton marking
This checklist is an original fictional example. A real programme defines tolerances, the sampling method and who signs each result.
The agreement behind the signature.
Before anyone signs, a programme needs four things written down: the tolerance, the sampling method, the window in which the inspection happens, and the remedy if the batch fails. Without those four, a failed delivery becomes an argument rather than a process.