DEMO / ORIGINAL DESIGN / FICTIONAL COMPANYDesign collection
NOCTRAOUTDOOR LUMINAIRES / SITE STUDIES
NOCTRA / Home

QUALITY

What a photograph of a lit fitting cannot confirm.

A product photograph is taken switched on in a dark room with the exposure set for the fitting. A real project has daylight, reflected surfaces and people in it.

Example inspection checklist — illustrative

Output and distribution
Measured on the actual optical unit, not the marketing figure
Colour rendering
Confirmed at the stated CRI and correlated colour temperature
Dimming behaviour
At the low end as well as full output, on the declared driver
Flicker
Measured at the declared dim level with the declared driver
Thermal behaviour
Case temperature at the declared ambient and mounting
Ingress protection
Tested on the assembled fitting in its declared orientation
Mounting and fixings
Hold the declared weight with the declared fixings
Packaging
Correct accessories, correct protection, correct carton marking

This checklist is an original fictional example. A real programme defines tolerances, the sampling method and who signs each result.

The agreement behind the signature.

Before anyone signs, a programme needs four things written down: the tolerance, the sampling method, the window in which the inspection happens, and the remedy if the batch fails. Without those four, a failed delivery becomes an argument rather than a process.

Continue.