QUALITY / PENMORA
What a latency figure cannot confirm.
A latency number is measured on a bench under ideal conditions. Drawing is a moving hand under pressure, and the two are different problems.
Example inspection checklist.
Example checklist — illustrative
- Digitiser uniformity
- Across the full active area, not at the centre
- Pen tracking
- Traced against the declared accuracy, corner to corner
- Pressure response
- Monotonic across the declared range, with no dropouts
- Tilt and hover
- Behaviour as declared, if tilt is declared at all
- Palm rejection
- With a palm resting where a hand actually rests
- Surface wear
- Checked after the declared use, not after a week
- Pen pairing
- Reconnects as declared, including after sleep
- Packaging
- Correct accessories, correct protection, correct carton marking
This checklist is an original fictional example. A real programme defines tolerances, the sampling method and who signs each result.
The agreement behind the signature.
Four things to write down first
An inspection result is only as useful as the agreement behind it. Before anyone signs, a programme needs the tolerance, the sampling method, the window in which the inspection happens, and the remedy if the batch fails. Without those four, a failed delivery becomes an argument rather than a process.