QUALITY / CLASPORA
What a photograph cannot confirm.
A mount photograph shows a joint. What decides whether the device is still attached in six months is a load test and a cycle count.
Example inspection checklist.
Example checklist — illustrative
- Static load
- Held at the declared load for the declared duration
- Cycle count
- Open, close and re-set to the stated number before failure
- Clamping force
- Measured on the actual device, not on a gauge block
- Surface damage
- No marking or slip on the device after cycling
- Joint security
- Does not release under the declared side load
- Material and finish
- Confirmed against the specification, not the sample colour
- Fixings included
- Correct parts, correct count, and they fit
- Packaging
- Correct protection, correct labelling, correct carton marking
This checklist is an original fictional example. A real programme defines tolerances, the sampling method and who signs each result.
The agreement behind the signature.
Four things to write down first
An inspection result is only as useful as the agreement behind it. Before anyone signs, a programme needs the tolerance, the sampling method, the window in which the inspection happens, and the remedy if the batch fails. Without those four, a failed delivery becomes an argument rather than a process.