01
Incoming component
Check the actual component against the approved specification.
QUALITY / FRAMEVA
A product image shows an imaging device looking correct. Almost none of what a buyer is paying for is visible in that image, and each part has to be confirmed separately.
01
Check the actual component against the approved specification.
02
Observe assembly and finish at the bench.
03
Compare the finished unit to the approved sample, point by point.
| Sensor revision | Matches the revision released for production, and is marked on the unit |
|---|---|
| Optical alignment | Checked against the approved sample across the full field |
| Stabilisation | Measured with the movement the unit is sold for |
| Firmware | Matches the released build for this hardware revision |
| Thermal behaviour | Case temperature recorded at the declared continuous duty |
| Mounting and fixings | Hold the declared load in the declared orientation |
| Accessories | Correct items, correct labelling, correct count |
| Carton | Correct marking, correct orientation, correct stacking |
This checklist is an original fictional example. A real programme defines tolerances, the sampling method and who signs each result.
An inspection result is only as useful as the agreement behind it. Before anyone signs, a programme needs four things written down: the tolerance, the sampling method, the window in which the inspection happens, and the remedy if the batch fails. Without those four, a failed delivery becomes an argument rather than a process.