01
Incoming component
Check the actual component against the approved specification.
QUALITY & INSPECTION / FIELDVOLT
A photograph cannot confirm that a unit holds a load. Only a measurement against a written checklist confirms a batch.
01
Check the actual component against the approved specification.
02
Observe assembly and finish at the bench.
03
Compare the finished unit to the approved sample, point by point.
| Cell lot | Matches the declared cell specification and carries a readable lot code |
|---|---|
| Capacity | Measured at the declared rate, not quoted from a datasheet |
| Output under load | Measured with a representative load, not at no load |
| Thermal behaviour | Case temperature recorded at the declared sustained load |
| Ingress rating | Tested on the assembled enclosure, not on a component |
| Protections | Over-current, over-temperature and short-circuit behaviour confirmed |
| Label and markings | Ratings, warnings and origin content match the approved artwork |
| Packing | Correct accessories, correct protection, correct carton marking |
This checklist is an original fictional example. A real programme defines tolerances, the sampling method and who signs each result.
An inspection result is only as useful as the agreement behind it. Before anyone signs, the programme needs four things written down: the tolerance, the sampling method, the window in which the inspection happens, and the remedy if the batch fails. Without those four, a failed delivery becomes an argument rather than a process. This page shows the shape such a checklist takes; it does not replace agreeing it.