01
Incoming component
Check the actual component against the approved specification.
QUALITY & INSPECTION / FASHION
A photograph cannot confirm that a seam will hold. Only a measurement against a written checklist confirms a batch.
01
Check the actual component against the approved specification.
02
Observe assembly and finish at the bench.
03
Compare the finished unit to the approved sample, point by point.
| Fabric | Matches the approved lab dip and hand feel |
|---|---|
| Colour | Within the agreed tolerance of the approved lab dip |
| Measurement | Every point on the approved size chart within tolerance |
| Seams | Stitch density and seam strength at the load points |
| Trims | Correct buttons, zips and thread, and they function |
| Labelling | Composition, care and origin content matches the approved artwork |
| Press and finish | No creasing, no shading, no loose threads |
| Packing | Correct fold, correct polybag, correct carton marking |
This checklist is an original fictional example. A real programme defines tolerances, the sampling method and who signs each result.
An inspection result is only as useful as the agreement behind it. Before anyone signs, the programme needs four things written down: the tolerance, the sampling method, the window in which the inspection happens, and the remedy if the batch fails. Without those four, a failed delivery becomes an argument rather than a process. This page shows the shape such a checklist takes; it does not replace agreeing it.