Incoming component
Check the actual component against the approved specification.
QUALITY & INSPECTION / ELECTRONICS
A photograph cannot confirm that a radio passes. Only a signed inspection against a written checklist confirms a batch.
01
Check the actual component against the approved specification.
02
Observe assembly and finish at the bench.
03
Compare the finished unit to the approved sample, point by point.
| Hardware revision | Matches the revision released for production |
|---|---|
| Antenna performance | Measured on the final enclosure, not a bare board |
| Battery safety | Cell lot and protection circuit confirmed against the declared rating |
| Ports and buttons | Present, aligned and operating after the reflow and assembly cycle |
| Firmware version | Matches the version released for this hardware revision |
| Cosmetic finish | Scratch, dent and marking work within the agreed sample |
| Accessories and pack | Correct items, correct labelling, correct count |
| Master carton | Correct marking, correct orientation, correct stacking |
This checklist is an original fictional example. A real programme defines tolerances, the sampling method and who signs each result.
An inspection result is only as useful as the agreement behind it. Before anyone signs, the programme needs four things written down: the tolerance, the sampling method, the window in which the inspection happens, and the remedy if the batch fails. Without those four, a failed delivery becomes an argument rather than a process. This page shows the shape such a checklist takes; it does not replace agreeing it.