TENON / Home
QUALITY
What a picture cannot settle.
A photograph shows a table in a room, unloaded, level, on a good floor. Every one of those is doing work in the picture.
Example inspection checklist — illustrative
- Level and stability
- Checked assembled, on an uneven floor, loaded
- Top movement
- Tracked across the declared humidity range
- Joint integrity
- Base joints checked after a load and unload cycle
- Extension action
- Run through its full travel repeatedly
- Surface finish
- Confirmed on the delivered finish, not the sample
- Stability under lean
- Checked at the declared point of lean
- Fixings and instructions
- Complete, legible and matching the delivered configuration
- Packaging
- Top separated from base, corners protected, hardware bagged
This checklist is an original fictional example. A real programme defines tolerances, the sampling method and who signs each result.
The agreement behind the signature.
Before anyone signs, a programme needs four things written down: the tolerance, the sampling method, the window in which the inspection happens, and the remedy if the batch fails. Without those four, a failed delivery becomes an argument rather than a process.
Continue.
Worth deciding early.
Stability is checked at the extreme settings, loaded and leaned on, because a table that wobbles at one end in a showroom will wobble at both ends in a kitchen.