
B9 / Start with control
Enclosed controller kit concept
Controller / connector revision / activity scope
| Enclosed controller | 1 proposed concept unit |
|---|---|
| Connection cable | 1 proposed item; confirm |
| Activity material | Buyer-owned scope / not a course |
Physical devices.
Named responsibilities.
Sample-led decisions.
Fictional concept edition.

Physical kits for supervised making.
Controller, sensor and desk-rover concepts organized around parts, activity samples and repeatable pack contents.
Begin with the activity, then name the parts and the sample revision.

B9 / Start with control
Controller / connector revision / activity scope
| Enclosed controller | 1 proposed concept unit |
|---|---|
| Connection cable | 1 proposed item; confirm |
| Activity material | Buyer-owned scope / not a course |

S3 / Explore inputs
Pod identities / synthetic output / connector set
| Enclosed pods | 3 proposed concepts / identities open |
|---|---|
| Keyed cables | Proposed set; length and interface open |
| Output record | Synthetic activity scope only |

R2 / Make movement
Chassis / guarded assembly / sample activity
| Chassis and wheel set | 1 proposed concept assembly |
|---|---|
| Enclosed controller | 1 proposed concept module |
| Cable / supply / tools | Scope to define; not implied |
Beyond the main module
A board, a cable and a tray are different scope items. Keep them visible in a sample pack record.
Try the local main-set planner ↗Identify module types, keyed connector revision and proposed cable contents.
The responsible buyer team reviews the intended use, supply and supervised activity protocol.
Agree parts identification, protection, language and replenishment scope.
An open development brief
No age suitability, completed safety test or educational outcome is implied. Bring a real activity brief and sample review to the actual supplier conversation.
Read the physical-kit procurement FAQ ↗