01
Incoming component
Check the actual component against the purchase specification.
QUALITY & INSPECTION / INDUSTRIAL-PACKAGING-2
A photograph confirms the shape. Only a signed inspection against a written checklist confirms a batch.
01
Check the actual component against the purchase specification.
02
Observe forming and closing at the bench.
03
Compare the finished unit to the approved sample, point by point.
| Film grade | Confirmed against the purchase specification, not the sample |
|---|---|
| Loop strength | Tested at the declared working load with a safety factor |
| Dimensions | Within the agreed tolerance of the approved sample |
| Print and marking | Correct artwork, correct placement, correct orientation |
| Bag count per pallet | Correct count, correct layer pattern |
| Pallet specification | Correct board grade and correct load rating |
This checklist is an original fictional example. A real programme defines tolerances, the sampling method and who signs each result.
A signed inspection is only as good as the agreement behind it, and in bulk handling that agreement usually turns on two things the paperwork forgets: the handling method at each point, and the fill consistency. A bag that passed inspection can still fail because it was inspected empty and lifted full. Before anyone signs, the programme needs the loop strength at the declared load, the fill behaviour, and the count per pallet written down, together with the remedy if the batch does not match.