01
Incoming component
Check the actual component against the approved reference before it enters production.
QUALITY & INSPECTION / SPORTS-QA
A photograph cannot confirm a bounce. A sample can confirm one sample but not a production run.
01
Check the actual component against the approved reference before it enters production.
02
Observe assembly and finish at the bench.
03
Compare the finished item to the approved sample, point by point.
| Dimensions | Within the agreed tolerance against the approved sample |
|---|---|
| Seam and joint integrity | No splits at the load points |
| Grip | Checked on the intended surface finish |
| Bounce and roll | Measured, not described |
| Marking contrast | Readable at the intended session distance |
| Small parts | Checked and documented before packing |
| Odour | Assessed after the agreed cure period |
| Packing | Correct folding or rolling, correct insert, correct carton marking |
This checklist is an original fictional example. A real program defines tolerances, the sampling method and who signs each result.

WHAT A PHOTO PROVES
Shows an intended look. Proves nothing about material or construction.
Proves that one example is buildable. Proves nothing about a production run.
Proves that a defined batch met a defined checklist, and only that batch.