01
Incoming component
Check the actual component against the approved specification.
QUALITY & INSPECTION / ROOMNODE
A photograph cannot confirm that a device joins a network. Only an installation against a written checklist confirms a batch.
01
Check the actual component against the approved specification.
02
Observe assembly and finish at the bench.
03
Compare the finished unit to the approved sample, point by point.
| Radio join rate | Measured in a furnished room, not an open space |
|---|---|
| Power draw | At the declared standby and active states |
| Enclosure mounting | Fixings hold in the declared orientation and material |
| Reset and recovery | A non-technical user can recover the device as documented |
| Firmware | Matches the version released for this hardware revision |
| Interoperability | Pairs with the declared range, and fails gracefully outside it |
| Markings and labelling | Ratings, warnings and origin content match the approved artwork |
| Packing | Correct accessories, correct protection, correct carton marking |
This checklist is an original fictional example. A real programme defines tolerances, the sampling method and who signs each result.
An inspection result is only as useful as the agreement behind it. Before anyone signs, the programme needs four things written down: the tolerance, the sampling method, the window in which the inspection happens, and the remedy if the batch fails. Without those four, a failed delivery becomes an argument rather than a process. This page shows the shape such a checklist takes; it does not replace agreeing it.