01
Incoming component
Check the actual component against the approved specification.
QUALITY & INSPECTION / GARDEN
A photograph cannot confirm that an object survives winter. Only a test against a written standard confirms a batch.
01
Check the actual component against the approved specification.
02
Observe assembly and finish at the bench.
03
Compare the finished unit to the approved sample, point by point.
| Material | Matches the approved sample in hand feel and colour |
|---|---|
| Finish | Adhesion and appearance after the agreed exposure period |
| Drainage | Sheds water as designed, with no pooling at the base |
| Fixings | Correct fixings, correctly torqued, and they hold the declared load |
| Dimensions | Within the agreed tolerance of the approved sample |
| Edges and surfaces | No sharp edges, no burrs, no exposed fixings |
| Markings | Care and origin content matches the approved artwork |
| Packing | Correct protection, correct labelling, correct carton marking |
This checklist is an original fictional example. A real programme defines tolerances, the sampling method and who signs each result.
An inspection result is only as useful as the agreement behind it. Before anyone signs, the programme needs four things written down: the tolerance, the sampling method, the window in which the inspection happens, and the remedy if the batch fails. Without those four, a failed delivery becomes an argument rather than a process. This page shows the shape such a checklist takes; it does not replace agreeing it.